Skip to content
Project Details
Building Dimensions
Foundation

Wall Construction
Stud Wall Framing
Exterior Wall Surface (over studs):
Roof Construction
Roof Framing Method:
Roof Deck Material:
Openings
Floor Plan β€” drag openings to reposition Β· scroll to zoom Β· drag background to pan Β· double-click door to flip hinge

No openings added yet β€” use the buttons above or drag openings from the floor plan.

Exterior Finishes & Trim

Exterior Wall Cladding

Note: An additional $0.15/sqft surcharge for typar air barrier is included.

Exterior Trim

Roofing Material
Interior Finishes

Mezzanine
Labour Hours

Review and adjust all labour hour estimates. Changes update the cost summary in real time.

Task Hours
Concrete Floor
Foundation Wall
Wall Framing
Roof Framing / Sheathing
Openings Installation
Cladding
Roofing
Miscellaneous Items
Equipment Rental
Cleanup
Travel
Safety/Supervision
Total Labour Hours β€”
Management Hours

Management hours are billed at the management rate. Add or remove items as needed.

Task Hours
Project Management
Drawings
Pricing/Invoicing
Miscellaneous
Total Management Hours β€”
Rate Overrides

These values override the system-set rates for this session only β€” they do not permanently change your admin settings.

System default: $45/hr
System default: $65/hr
Miscellaneous Items
Trades
Equipment Rental
AI Building Drawing
Floor Plan (drag openings to reposition or move around corners β€” scroll to zoom β€” drag background to pan)
Click to interact

Use the colour controls and orbit the 3D preview to frame the view you want, then click Generate AI Drawing to create a photorealistic rendering.

Click to interact

This hint is appended to the AI's system prompt for this request only.

Gara Farm Buildings Inc.